Anschutz Health Sciences

Project Overview

The Anschutz Health Sciences Building, which is expected to open in mid-2021. The seven story, 390,914 SF structure serves as a beacon, marking an entry point to the campus via the “artwalk” – a path connecting many campus buildings.

The building program will support multiple users, including researchers, faculty and staff, students and patients. The space includes facilities for computational research and clinical trials, an educational medical simulation hub, mental/behavioral health research clinics, faculty offices, and other educational and amenity areas to be shared by the campus.

Working with Group 14 Engineering, Pie’s services on the LEED Gold V4 project include technical peer review of the OPR & BOD, Plan and Specifications Review, BECx Plan and Specifications, Sub-Contractor Shop Drawings/Submittals Review, preparation of Construction QC Checklists, on-site Quality Assurance Observations, ASTM E783 and E1105 Air Infiltration and Water Penetration Testing, and project Close-Out reporting and Warranty site visit.

Related Healthcare Projects