CoorsTek R&D and Advanced Material Processing Facility

Project Overview

The $81M project consists of a two-story, 300,000 SF building providing world class Research & Development and Advanced Material Processing facilities in Golden, Colorado. The facility provides a state-of-the-art research and development hub outfitted with leading-edge equipment to develop innovative ceramic materials and processes for a variety of next-generation applications, a sophisticated analytical laboratory to provide the most comprehensive ceramic analyses available, and a world-class materials manufacturing facility enabling swift commercialization and volume production using the latest technologies in advanced ceramic processing.

Working with Mortenson Construction, Pie’s services for the Phase I renovation included one Familiarization Review of the As-Built drawings of the existing building and the plans for the R&D area, one On-site Quality Assurance observation and AAMA 501.2 Water Spray Testing. Phase 2 services included a 100% Construction Document (CD) Phase Review, Shop Drawing & Submittal Reviews, Pre-Installation Meetings, On-site Quality Assurance Observations, ASTM C1153 Nighttime Infrared roof Scan and AAMA 501.2 Water Spray Testing.

Related High-Tech, Labs & Manufacturing Projects

Back

Service:
Building Enclosures & Commissioning (BECx)
Performance Testing & Monitoring

Market:
High-Tech, Labs & Manufacturing

Location:
Golden, CO